Proudly Canadian
    PartnersResources
Is Your Data Center Really Ready for AI? Here’s How to Tell 

Is Your Data Center Really Ready for AI? Here’s How to Tell 

Microserve
August 12, 2025

💡TL;DR

The rise of AI demands a complete overhaul of legacy data centers. This guide provides a checklist to evaluate your infrastructure’s readiness, from power and cooling to networks and sustainability. Upgrading for AI is critical for performance and efficiency, and our article outlines the key metrics and actionable steps to help your organization get there.

When someone says your data center should be “AI-ready,” they talk about more than just high-speed servers. It means power delivery, cooling, networking, storage, and even sustainability; all need a serious upgrade.

AI transformation depends on more than just software, it challenges every aspect of your data center: Trying to shoehorn AI into legacy infrastructure is like putting an F‑1 engine into a family sedan; it simply won’t perform.

Let’s walk through the tell‑tale signs, critical metrics, and decision points to evaluate your AI‑readiness, and chart the smart upgrades that pay off fast.

1. Compute & Power: Does Your Grid Have the Capacity?

GPU rack

Modern AI workloads demand massive GPUs, TPUs, or inference accelerators. Their power spikes are no joke: 

  • According to the IEA, global data center electricity consumption reached around 415 TWh in 2024, about 1.5% of global electricity, and is projected to almost double to 945 TWh by 2030, with accelerated servers (AI) driving nearly 30% annual growth (iea.org). 
  • Air-based cooling alone accounts for up to 40% of data center electricity use, so the strain is amplified (deloitte.com). 

Watch for signs like: 

  • Frequent breaker trips or derated circuits 
  • Metered demand ceilings 
  • Power draw surges when AI workloads run 

What to do: 

  • Engage with power utilities early for capacity planning 
  • Invest in redundant UPS and microgrid infrastructure 
  • Upgrade rack density and ensure proper power phase balancing 

2. Liquid Cooling: Can Your System Handle the Heat? 

image

AI-ready servers can consume over 100 kW per rack, air cooling alone can’t keep up. 

Traditional air-based cooling is inefficient and power-hungry, often accounting for up to 40% of a data center’s energy usage. As AI and HPC workloads grow in scale, cooling becomes a core infrastructure challenge, not just a support function. 

Why It Matters: 

  • Power efficiency: Liquid cooling cuts cooling power usage by up to 40%. 
  • Higher density: Enables compact, high-performance AI rack designs. 
  • Fanless operation: Eliminates noisy, inefficient fans and ducting. 
  • Heat reuse: Warm-water systems support sustainability initiatives. 

Red Flags to Watch: 

  • Rack densities exceeding 50–100 kW 
  • Soaring cooling costs or fan-related outages 
  • Hot spots or thermal throttling on AI workloads 

What to Do: 

  • Explore direct-to-chip or immersion liquid cooling 
  • Partner with vendors experienced in fluid and thermal engineering 
  • Consider warm-water reuse to improve ESG impact 

Liquid cooling isn’t optional, it’s essential for AI-scale computing. It improves performance, energy efficiency, and long-term sustainability.  

3. Infrastructure & Networks: Built to Scale? 

image 2

AI workloads require ultra-fast networking and high-density compute: 

  • A Cisco AI Readiness Index revealed nearly 79% of companies experience network latency during AI job processing (Cisco.com). 
  • Flexential’s 2024 survey found that few current data centers are designed for high-density AI workloads and tight SLAs (flexential.com). 

Check your setup: 

  • Can racks support 50–100 kW density? 
  • Is your internal network ready for 400 GbE or higher? 
  • Do you operate hybrid or edge zones for latency-sensitive AI? 

Upgrade path: 

  • Integrate high-speed switching, RDMA fabrics, NVLink/PCIe Gen5 connectivity 
  • Standardize rack layouts for GPU blades or inference appliances 

4. Data & Orchestration: A Hidden Bottleneck

image 1

Infrastructure is only as good as the data and processing path you build over it: 

  • Cisco found just 32% of organizations felt highly ready on data to deploy AI, while 80% reported data preprocessing issues remain unresolved ( newsroom.cisco.com). 
  • Qlik’s survey confirms only 12% feel ready for agentic AI workflows despite widespread AI strategy adoption (qlik.com). 
  • A Capital One–sponsored poll found nine in ten business leaders think systems are ready, yet nearly all IT workers spend hours daily cleaning and reworking datasets (cio.com). 

Check your ground truth: 

  • Is your data pipeline structured for real-time training and inference? 
  • Do you automate retraining, validation, data quality, feature pipelines? 
  • Are orchestration systems like Kubernetes or ML platforms able to scale? 

What to fix: 

  • Build end‑to‑end pipelines covering data ingestion, cleansing, versioning, training, and CI/CD 
  • Bring in monitoring tools for compute use, model drift, GPU utilization 

5. Sustainability & ESG Compliance: The Overlooked Imperative

image 3

AI’s carbon and water footprint is under regulatory, and public scrutiny: 

  • Business Insider reports over 1,240 AI data centers built or approved in the U.S. up nearly 4× since 2010 (businessinsider.com). These may soon use more electricity than countries such as Poland. 
  • Guardian investigations found Google’s actual emissions rose 65% between 2019–2024, more than publicly reported, with water withdrawal up 27% in the same period (theguardian.com). 
  • Training GPT‑3 alone reportedly evaporated 700,000 liters of water, prompting new transparency around AI’s water demands (arxiv.org). 
  • If business as usual continues, annual AI water use will reach 6.6 billion m³ by 2027, more than half of UK’s annual use (theguardian.com). 

Start actioning: 

  • Monitor Power Usage Effectiveness (PUE) and Water Usage Effectiveness (WUE). 
  • Source renewable energy or sign PPA contracts 
  • Invest in water-efficient cooling and reclamation systems 

6. The AI‑Readiness Scorecard 

Dimension Key Red Flags What You Should Do 
Power & Grid Frequent trips, demand limits Plan grid upgrades, add UPS, consider microgrids 
Cooling & Water Evaporation-based cooling, water stress Implement liquid/immersion cooling, recycle water 
Compute & Networking No GPU/Tensor capability, latency Upgrade to AI servers, fast fabrics, hybrid infrastructure 
Data & Orchestration Manual ops, dirty pipelines, siloed data Build clean pipelines, automate ML ops, organize data foundations 
Sustainability & ESG High PUE/WUE, location in scarce areas Source renewables, track usage, optimize PUE/WUE 

Real‑World Examples & What’s Coming 

  • IBM Power11 servers, rolling out July 2025, promise nearly zero unplanned downtime and built-in ransomware detection for inference workloads, perfect for production AI deployments (reuters.com). 
  • For hyperscale projects, governments in Australia are planning 1 GW data centers powered entirely by renewables, built to support local AI expansion (adelaidenow.com.au). 

Final Thoughts 

You’re trying to build AI for tomorrow, but legacy infrastructure was built for yesterday. The good news is that awareness is high and solutions already exist, from immersion cooling to specialized inference chips. 

Take action now: 

  1. Audit power, cooling, and compute capacity today. 
  1. Run pilot AI workloads to stress-test critical infrastructure. 
  1. Prioritize upgrades that deliver scalability and efficiency. 
  1. Measure performance in PUE, WUE, emissions, utilization. 
  1. Choose hybrid and modular designs to evolve with AI needs. 

AI isn’t a buzzword; it’s infrastructure intensive. Make sure your organization is built to support it. If you’d like a custom readiness quiz, advice on pilot strategy, or help sourcing AI‑ready hardware and cooling solutions, just say the word. 

Curious about AI readiness? Let’s talk. Connect with Microserve today.